Construction of the Mosaic wall for the 11th floor of Red Square Building

3/4"cut out woods for the seagulls

 

Cut out wood of the top seagull and the posterior cover with mosaics

 
   

The three seagulls almost ready (top one without the grout)

cutting the background tiles

 

Backgrownd mosaics marked and ready to be cut
Seagull place on the cut backgrownd.
Home Return to General Mosaics Before